INTENSIVE WORKS ON THE FOUNTAIN IN PARK “RAVNE 2”

INTENSIVE WORKS ON THE FOUNTAIN IN PARK “RAVNE 2”

Despite the temperatures which are reaching 40C degrees, the works on the construction of the outside water fountain with a pawn in the Park “Ravne 2” are progressing without reducing intensity.  

Almost the entire surface of the fountain is covered with the river stone. The contractors made four cascades which will benefit the faster and louder water flow.

The excavator started with digging the channel which will bring the water caught in the first valley. Here we have four small springs active throughout the year never drying out. During the winter season, when the fountain is out of function the water will be released in the existing springs.

In several days the exterior LED lights will be installed. It’s expected that the fountain will be operational at the planned time of ten days, or until August 21, 2017. The final works are related to the landscaping of the terrain around the fountain, planting of the bushes and mounting of the bridges over the cascades.

Gallery

News

Prev Next

NEW SCIENTIFIC STUDY IN ACTA SCIENTIFIC MEDICAL SCIENCES CONFIRMS THE ENVIRONMENTAL IMPACT OF THE BOSNIAN PYRAMIDS

NEW SCIENTIFIC STUDY IN ACTA SCIENTIFIC MEDICAL SCIENCES CONFIRMS THE ENVIRONMENTAL IMPACT OF THE BOSNIAN PYRAMIDS

A scientific study published in the international journal Acta Scientific Medical Sciences presents significant findings on the influence of Bosnian... Detaljnije

THE U.S. TOUR OF DR. OSMANAGICH POSTPONED TO NOVEMBER 2026

THE U.S. TOUR OF DR. OSMANAGICH POSTPONED TO NOVEMBER 2026

We inform the public that the April tour of the discoverer of the Bosnian pyramids, Dr. Sam Osmanagich, across four... Detaljnije

BREAKING: New Scientific Publication on Bosnian Pyramid Tunnels –Ravne 6

BREAKING: New Scientific Publication on Bosnian Pyramid Tunnels –Ravne 6

An international peer-reviewed scientific journal has published a new research article authored by Dr. Sam Osmanagich, Principal Investigator of the... Detaljnije

New Insights from Independent Sessions on the Bosnian Pyramids

New Insights from Independent Sessions on the Bosnian Pyramids

In recent weeks, we received a series of intriguing session transcripts from researchers Petteri Viitanen and his colleague Antti, who... Detaljnije

“Europe’s Oldest and Known Structures-The Pyramids of Bosnia”

“Europe’s Oldest and Known Structures-The Pyramids of Bosnia”

Sedona, AZ- April 19, 2026-The upcoming presentation by Dr. Sam Osmanagich promises to ignite curiosity and challenge long‑held assumptions about... Detaljnije

Exclusive Interview with Dr Sam Osmanagich and Michael Feeley

Exclusive Interview with Dr Sam Osmanagich and Michael Feeley

I sat down with Dr Sam Osmanagich to explore the truth behind the Bosnian Pyramids, uncovering insights that challenge everything... Detaljnije

Novak Djokovic Returns to the Bosnian Pyramids: Holding the Pleiades Codein His Hands

Novak Djokovic Returns to the Bosnian Pyramids: Holding the Pleiades Codein His Hands

When Novak Djokovic returns to the Bosnian pyramids, it is no longer just a visit.It is a pattern. This week,... Detaljnije

THE U.S. TOUR BEGINS: FROM CHICAGO TO SANTA FE – THE TRUTH ABOUT THE WORLD’S OLDEST PYRAMIDS COMES TO AMERICA

THE U.S. TOUR BEGINS: FROM CHICAGO TO SANTA FE – THE TRUTH ABOUT THE WORLD’S OLDEST PYRAMIDS COMES TO AMERICA

The discoverer of the Bosnian Pyramids, Dr. Sam Osmanagich, continues his global mission to present one of the most exciting... Detaljnije

Copyright 2025- © Archaeological Park: Bosnian Pyramid of the Sun Foundation. All rights reserved.