THE FOUNDATION, MUNICIPALITY AND PUBLIC UTILITY SERVICE “VISOKO” ARE BUILDING 450 METERS OF THE ROAD AT RAVNE

THE FOUNDATION, MUNICIPALITY AND PUBLIC UTILITY SERVICE “VISOKO” ARE BUILDING 450 METERS OF THE ROAD AT RAVNE

After Municipality of Visoko brought the decision to close the traffic permanently at the road section from the entrance of the Tunnels Ravne to the excursion site Ravne, the realization of this complex project has begun. The route that will replace the existing narrow road has been defined. The new route turns near the Foundation’s Museum building and passes through the bottom toward the south to the Municipal land that exits at “Žuta greda”.

New regulatory plan of Ravne will define the content of the Municipal parcel, which will include parking for tourist buses and vehicles to hospitality facilities.

Creating the pedestrian zone in front of Tunnels Ravne will contribute to the safety of tourists and to a longer stay in this part of Visoko.

The “Archaeological Park: Bosnian Pyramid of the Sun” Foundation accepted with satisfaction Municipality’s idea and employed significant financial, organizational and human resources for its realization. The Foundation decided to finance the major part of the construction of the first 150-meters long road section from the Museum. Besides this, the parallel road is being built on the Foundation’s parcel, which is exiting on the parking of the Foundation. This road section will be open for traffic during the day and it will hold a double function: as the alternative to the main road in busiest days, and besides that, it will lead to the Air Spa and Medicinal Forrest of the Foundation.

The access to the Air Spa will have two tracks forming a roundabout. The total length of all these roads will be 450 meters and it will permanently solve the question of the access to Tunnels Ravne, Park “Ravne 2”, Excursion Site Ravne and Air Spa, and parking for many vehicles.

The ramps will be placed before the Air Spa and these roads will be closed during the night in order to prevent unnecessary stay or waste disposal.

During the works performed in March and April 2018, Foundation employed the necessary mechanization for clearing of the terrain, making the way for the road, filling with 650 cubic meters of rough tampons and rolling, what means excavators, trucks, tractor, and a roller. In the final stage, Public Utility Service “Visoko” had joined the operations, providing the fine tampon and filling with a bulldozer.

The Municipal team, led by the Mayor, Assistant for Economic Development and experts from the Urban Planning Service supervised the results at the site on regular basis.

It is expected that during May the first section of the road should be ready for asphalting. It is assumed that the Municipal Decision on Closing Traffic on the road section from the Tunnels Ravne to Excursion Site Ravne will become effective during June.

Gallery

News

Prev Next

Valery Uvarov (Russia): ‘God helps you!’

Valery Uvarov (Russia): ‘God helps you!’

Pyramid builder and researcher giving his impressions on the last day of the Summer Solstice Tour, Conference and Festival held... Detaljnije

FOUNDATION ANNIVERSARY – TWENTY YEARS SINCE ESTABLISHMENT

FOUNDATION ANNIVERSARY – TWENTY YEARS SINCE ESTABLISHMENT

On Sunday, November 9, 2025, it will be twenty years since the Ministry of Justice of Bosnia and Herzegovina registered... Detaljnije

Dr J.J. Hurtak and Dr. Desiree Hurtak summarize their observations from the visit

Dr J.J. Hurtak and Dr. Desiree Hurtak summarize their observations from the visit

Detaljnije

Ken Cherry: ‘This is incredible information!’

Ken Cherry: ‘This is incredible information!’

Leading Texan researcher of the conspiracies spent a week investigating Bosnian Pyramids during the Summer Solstice Tour and Conference in... Detaljnije

BOSNIAN PYRAMIDS, THE LIVING FIELD OF GOODNESS

BOSNIAN PYRAMIDS, THE LIVING FIELD OF GOODNESS

Why I am so attracted to Bosnian pyramids, pyramidal mountain Rtanj other sacred sites on Balkans? One of reasons is... Detaljnije

BOSNIAN PYRAMID SUMMER SOLSTICE TOUR, CONFERENCE & FESTIVAL 2026

BOSNIAN PYRAMID SUMMER SOLSTICE TOUR, CONFERENCE & FESTIVAL 2026

BOSNIAN PYRAMID SUMMER SOLSTICE TOUR, CONFERENCE & FESTIVAL&BOSNIAN MEGALITHS: STONE SPHERES, MEGALITHIC WALLS & MEGALITHIC BLOCKS (‘STEĆAKS’)EXCLUSIVE TOUR WITH DR.... Detaljnije

Bosnian Pyramid Discoverer Dr Sam Osmanagich: Pyramids – Full Disclosure

Bosnian Pyramid Discoverer Dr Sam Osmanagich: Pyramids – Full Disclosure

Pyramids around the World and true purpose of Bosnian Pyramids with the Fibonacci Link between Bosnian Pyramids and Pleiades. Complete... Detaljnije

EXCLUSIVE: FIRST ARTIFACTS FOUND IN THE ‘RAVNE 6’ TUNNELS BY THE FOUNDATION’S ARCHAEOLOGIST

EXCLUSIVE: FIRST ARTIFACTS FOUND IN THE ‘RAVNE 6’ TUNNELS BY THE FOUNDATION’S ARCHAEOLOGIST

By: Ajla Šabanija Softić, M.A. – Field Archaeologist As the lead researcher at the Ravne 6 Tunnel site, I am... Detaljnije

Copyright 2025- © Archaeological Park: Bosnian Pyramid of the Sun Foundation. All rights reserved.
ZIATOGEL ZIATOGEL ZIATOGEL BEBASWD BEBASWD BEBASWD BEBASWD BEBASWD